Construction and Operation Photos


HOME    INFORMATION FOR OBSERVERS    ENGINEERING PROCEEDURES     CONSTRUCTION    LINKS

Photo albums associated with engineering proceedures
   Transport from Steward Observatory to the mountain
   Transport from the Common building to the summit, and into the telescope chamber

2013
 
April 4, 2013:  Stuff in Jill's barn
 
MMT April 6:  Stuff in the MMT Cabinet in the common building
 
May 2013:   Lab work on new slit mechanism before the engineering run

2011
 
MMT January 29:  Set up in the common building, working on MAESTRO
 
MMT March 27:  Injection optics area photos
  MMT November 9-15:  Work in the common building, and Engineering Run
  MMT November 28:  Day trip to remove guide camera, work on spectrograph

2010
  MMT March:  Snow
  MMT June 19-24   Photos of parts
  MMT June 24:  MAESTRO is stowed in the Common Building
  Lab  October:  Photos of Alignment Frame
  MMT December 8:  Trip to check out storage options;  water damage in Common building

2009
  Lab June 30:  working on collimation downtown
  December 8:  Mounting MAESTRO at the MMT
  December 11:  At the MMT

2008
 
MMT April 23:  Observing trip
 
MMT July 23: Observing trip
 
Lab August 4: Cart and lab set-up

2007
   April:  Mounting grating in cell at the Mirror Lab CMM
   Lab May 2:  Lens can
   Lab  May 2:  Mounting the prism
   Lab  June 24:  Calibration mirror and electronics
   Lab July:  Construction
   July 23:  Lab and trip to the mountain
   Lab  October 21:  Space frame
   Lab October 29:  Mounting lens cell
   MMT October 29:  Fit check baffle; new floor in the telescope chamber
   Lab  November 11:  grating cell
   Lab  November 21:  Working on flexure, grating cell
   November:  MMT Run
   Trip to the mountain, Dec. 2

2006
    Lab:  Pulltest
    April:  Space frame, grating cell
    June:  Lab
    November 28:  Mounting lens can

2005
    January:  3D cad drawings
    May:  at the CMM machine, mounting lenses;  jigs for alignment
    May:  MMT
    June:  Visit to Flex Rig at NOAO
    July:  at the CMM machine, mounting lenses
    July:  CMM machine, spectrograph frame construction
    July 25-26:  Fit check of cart and spectrograph structure at the MMT, after the fire
    August 2:  Sylgard lenses in lens cell

2004
    July 13:  Damage to lens by ZCR
    July:  Visit to ZCR
    October:  Damage to lens 4 by ZCR
    October:  Damage to the prism by ZCR
    MMT f/9 top box

2003
    April:  Delivery of dewar and controller at ITL
    June:  Trip to the mountain
    Calcium fluoride blanks

2002
    July 15:  Trip to OCIW to learn lens mounting techniques
    October 14:  Trip to OCIW; IMACS in the lab
   

Last update:  June 7, 2013