Warm Startup / Jan 27, 2018 / P Gabor ✔✘
Assuming there is time to turn the thermal system on for a couple of hours before opening VATT
BasementCheck dry air supply system dew point (typ. ~ -47)
BasementTurn on building & pier fans
DomeOpen dome register vents (there are four of them)
DomeOpen dome shutter (slit) manually: plug dome into the power socket (note on safety: this ensures dome short is out: tether attached to cord); operate the dome shutter by turning the control button on the electric box on the silo wall to the SE
DomeOpen West door (leading to ladder to the roof) and wedge it in the fully open position
Control roomTurn on the main dome fan (green button on a strip to the right of the SW balcony door)
Dome ventilation running
Even at wam startup it is prudent to reboot VATTEL and M2 PI Controller
Control roomKill the TCSglue; make sure M2 Controller is disconnected; kill all GUIs (if any)
TCS roomTurn M2 PI Controller off
TCS roomReboot VATTtel: press tiny “Reset” button, wait for the green “Run” and “Pass” LEDs, and for “Guider OK” on the monitor
TCS roomM2 PI Controller will need to be turned on later
Control roomMOUNT CONTROL tab: Turn cell fans “ON”
Silo 2nd lvlNESLAB: Check coolant level
Silo 2nd lvlNESLAB: Simultaneously: toggle fron panel ON/OFF switch to “ON” & slowly raise manual valve lever (to minimize vibration)
Silo 2nd lvlNESLAB: Also simultaneously: watch pneumatic-actuated valves “OPEN”
Silo 2nd lvlNESLAB: Check pressure gauge (usually well above the nominal 60 psi)
Control roomMOUNT CONTROL tab: Wait for “NESLAB is On” to appear
Control room@ VATTCONTROL (console) (follow this procedure only if VATTTEL is already booted)
Control roomStart APPS ⇒ VATT ⇒ TCS_GLUE
Control roomTHERMAL tab: note temperature differential (strut & mirror)
Control roomTHERMAL tab: radio button “ON” (do not use setpoint; setpoint to be used EXCLUSIVELY to change mirror temperature fast in time-critical situations; CLOSE SUPERVISION REQUIRED)
Themal system running
In immediate preparation of opening
DomeStart filling science camera dewar with LN2
DomeFill out LN2/camera log – listen for full dewar, cease flow when dewar is full
DomeCheck dome shutter is plugged into the wall power socket
DomeTurn on power supply of finder telescope camera (on top of box on South side of East fork)
DomeOpen finder telescope objective cover (CAUTION: check for snow on dome shutter if needed)
DomeCheck derotator rotation is at “home”/startup/init position and cable wrap is not twisted
DomeSBIG guider camera power supply (mounted on upper SW side of homed guider): Turn power “ON”
DomeDisconnect LN2 filler hose from camera dewar, move storage dewar off of telescope platform and south, to dome silo wall)
DomeRemove camera ground wire and clip it on silo, near storage dewar
DomeDisengage stow pins, note telescope is south heavy if mirror cover is closed (which it should be), and must be raised slightly in elevation towards zenith with hand pressure, until marks align. Failure to do this usually binds stow pins, resulting in failure of pins to fully release.
DomeCheck azimuth axis “home” (pointers best visible from lower level by the entrance to dome)
DomeCheck AZ hard stop flippers are showing green sides north.
DomeClose and lock West door (leading to ladder to the roof) for safety reasons (a person on the roof could get swept down by the rotating dome's shutters)
Dome actions done
BasementSTEP ONE (labeled as such): Pull out red switch, upper left corner of control box
BasementAfter recirculation pump starts, check flow meter by oil tank
BasementCheck that one chiller is “ON” (green indicator) (alternates between chillers #1 & #2, each on/off cycle)
BasementCheck oil temp set point (61 F)
BasementCheck oil temp actual (should rise immediately after recirculation pump starts, then settle at or very slightly above set point)
BasementCheck oil level light “OK” (if it's going to go out because of low oil level, it will do so after recirculation pump and/or pressure pumps have been started. May come back on after more running, as oil returns from azimuth bearing)
BasementSTEP TWO (labeled as such): Rotate pumps switch clockwise to “ON”
BasementCheck low side (feed pump) pressure rising
BasementWAIT FOR HIGH PRESSURE PUMP TO START
BasementCheck high pressure side: pressure and flow “OK” after running awhile 
BasementHydrostatic bearing oil system on
BasementUSE HEARING PROTECTION PROVIDED IF STAYING TO OBSERVE OPERATION OF PUMPS (muffs are by light switch)
Basement actions done
TCS roomM2 PI Controller: turn on
TCS roomToggle power switches “ON”: AZ, EL, DEROTATOR & DOME amplifiers (should see some AMPERES on dome amp readout). DO NOT POWER UP COUNTERWEIGHTS AMPLIFIER
EverywhereClose building blackout shades
Control roomTurn off the main dome fan (red button on a strip to the right of the SW balcony door)
Control roomTURN ON ALL VIDEO MONITORS, dome flood (left of the SW balcony door) & intercom (volume “up” listening to Dome)
Control roomStart APPS ⇒ VATT ⇒ GUIDER_APP (look for SBIG emblem on video monitor)
Control roomStart APPS ⇒ VATT ⇒ XEPHEM
Control roomMOUNT CONTROL tab: Open dome shutter (slit), listen for sound of proper operation in intercom
Control roomMOUNT CONTROL tab: Open mirror cover, listen for sound of proper operation in intercom
Control roomMOUNT CONTROL tab: Enable drives (automatically releases brake)
Control roomDO NOT PRESS “Calibrate” on the MOUNT CONTROL tab!!! Could cause malfunction!!!
Control roomTCSglue main window: Turn on dome tracking by left clicking on the button displaying dome position
Control roomIf needed, right mouse click on dome control button will open offset input dialog box. Enter inputs and watch dome movement (floodlight on). Kill dialog box.
Control roomStart New Secondary mirror GUI (icon bottom left) and follow instructions to start autocollimation
Control roomXEPHEM: Calendar NOW button: PRESS 
Control roomXEPHEM: Update button (on bottom of dialog box): PRESS
Control roomXEPHEM: Calendar looping NOW button: PRESS 
Control roomXEPHEM: Watch “N Steps” value decrease: 99999x
Control roomXEPHEM: “Data” menu: Load/delete local files
Control roomXEPHEM: Dialog box/“filter” field: ENTER PATH TO USER FILES 
Control roomXEPHEM: “View” menu: Open Sky View
Control roomXEPHEM: SKY VIEW WINDOW:  “Telescope” menu: “Configure” window: Radio buttons (both checked/activated by default. Leave them that way): Show skyview marker; Enable Telescope GoTo; Radio button: Telecscope “running”: toggle on with mouse click
Control roomWarning box (“OK” verification): DISMISS
Control roomXEPHEM: Back to: SKY VIEW WINDOW (to perform TELESCOPE INITIALIZATION): Find a bright star near the meridian, at Elevation ~45°; Based on RA and DEC, picture 1st move in ALT – AZ telescope will make; After selecting star in Sky View window, pick Tel GoTo; WATCH telescope to see whether it is moving as envisaged. BE READY with software stop (hover mouse over “STOP” button); Watch for target star to go through finder field on monitor (usually exits the frame near upper left)
Control roomMOUNT CONTROL tab: Open paddle, select 100 arcsec/sec rate
Control roomPaddle: push telescope (usually NORTH) until object is recovered in finder-telescope monitor
Control roomPaddle: push telescope until object is in grease pencil cross-hairs circle
Control roomTCSglue main window: “Init co-ords” radio button: turn “ON” with mouse click (this can be done more than once without harmful effects)
Control roomTurn on the main dome fan (green button on a strip to the right of the SW balcony door)
Control roomturn intercom down
Control roomOpen Trouble Report (TRVATT) in browser, and note opening time, outside ambient temperature, relative humidity, wind velocity & direction
TELESCOPE “Go Live” SEQUENCE done
Control roomXEPHEM SKY VIEW WINDOW: Data menu: search memory & select target; Command Telescope: “GoTo” with mouse click
Control roomWATCH telescope to see whether it is moving as envisaged. BE READY with software stop (hover mouse over “STOP” button).
Control roomTCSglue main window: select filter
Control roomXEPHEM SKY VIEW WINDOW: “Go To” telescope to the collimation object (magnitude < 7)
Control roomPaddle: Jog selected object into finder telescope monitor cross hairs
Control roomTCSglue main window: Init co-ords (do this again because it will improve localized pointing: collimation object is in the vicinity of the science target)
Control roomCheck/optimize telescope focus with science camera (prior to collimation)
Control room“Autocollimation” must be running throughout the collimation & focusing procedure!
Control roomAdjust focus with New Secondary GUI, taking an exposure with the science camera and evaluating the distribution curve fit in IRAF xgterm
Control roomVATT Guider APP: “Guide box” tab: reset guider & user offsets
Control roomVATT Guider APP: “Guider” pull-down menu: select “View Field Center” (inserts pickoff mirror)
Control roomVATT Guider APP: “Camera” tab: INIT CAMERA; set 2 sec exposure; “START” (sets timer box in motion)
Control roomPaddle: push collimation object to center of guider monitor @ rate of 5 sec/sec. DO NOT USE GUIDER STAGES TO CENTER OBJECT.
Control roomVATT Guider APP: “Guide box” tab: defocus to obtain “donut” (user offset: cca -25)
Control roomReduce guide camera contrast until appropriate amount of splotchiness in “donut” to ascertain even distribution of energy.
Control roomNew Secondary GUI: adjust TipX, TipY to even out light distribution in “donut”, re-centering object with paddle
Control roomVATT Guider APP: “Guide box” tab: refocus (adjust user offset; it will be a value close to 0)
Control roomVATT Guider APP: “Guide box” tab: select U-mirror
Control roomCheck/optimize telescope focus with science camera (after collimation)
Collimation & focusing achieved
Control roomXEPHEM GoTo target using Skyview or Data search/load dialog box OR enter RA-Dec in TCSglue main window
Control roomUse Paddle to center target in the Finder
Control roomTake image with main science camera to check the field; use paddle to adjust; re-initialize coordinates as required
Target acquired
Control roomVATT Guider APP: “Guide box” tab: check that User X,Y offsets are 0; maintain the focus user offset determined after collimation
Control roomVATT Guider APP: “Camera” tab: set integration time to 0.5 s
Control roomVATT Guider APP: “Catalog” tab: select a circle (representation of a star) to move the guider camera stage (in this case the APP will adjust focus automatically; moving the stage by setting offsets may cause defocusing); watch the Guider camera output on monitor VERY CAREFULLY; if a star streaks by, wait until the motion is completed and then try to return to the star by setting offsets (the camera's field is cca 5×5 offsets units); adjust guider focus by setting an offset (sensitive to a single offset unit)
Control roomVATT Guider APP: “AutoGuider” tab: place the yellow square around the star; check that a centroid is calculated (line at the bottom of the window) and a red dot indicating the position of the centroid appears in the yellow square; open “Markers…” window, and press “Mark Pt.”; in the main window toggle last button to “Guiding…”
Control roomVATT Guider APP: if chopping required, set up additional markers by moving the telescope (paddle in jog mode), pressing “Mark Pt.” and naming the new marker; then chop by switching between the markers using the pull-down menu with the list of marker names (top right corner of the APP window)
Guiding set up