User Tools

Site Tools


vatt:vatt_streamlined_warm_startup_checklist

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
vatt:vatt_streamlined_warm_startup_checklist [2020/10/01 08:22]
paul
vatt:vatt_streamlined_warm_startup_checklist [2020/10/01 08:44] (current)
paul
Line 24: Line 24:
 |Control room|Start ''TCS_GLUE'' (double click desktop icon) | | |Control room|Start ''TCS_GLUE'' (double click desktop icon) | |
 |Control room|''TCSglue'' main window: Make sure dome tracking is enabled (left-clicking on the dome-position field toggles between tracking enabled/disabled)| | |Control room|''TCSglue'' main window: Make sure dome tracking is enabled (left-clicking on the dome-position field toggles between tracking enabled/disabled)| |
-|Control room|''TCSglue'' > ''Mount Control'' tab: Toggle the Telescope Control System's status bit regarding the dome slit: Click the ''Open Slit'' button (it will toggle to ''Close Slit''). The slit will then need to be opened from the dome in due course. **The dome slit control unit is deteriorating. As a consequence, opening the slit must be triggered in the dome. The Telescope Control System's status must anticipate the physical change.**| |+|Control room|''TCSglue'' > ''Mount Control'' tab: Toggle the Telescope Control System's status bit regarding the dome slit: Click the ''Open Slit'' button (it will toggle to ''Close Slit''). The slit will then need to be opened from the dome in due course. **The dome slit control unit is deteriorating. As a consequence, the dome slit motor must be activated in the dome.. The Telescope Control System's status must anticipate the physical change.**| |
 | | | |  | | | | 
 |Dome|**Dome procedures**| | |Dome|**Dome procedures**| |
vatt/vatt_streamlined_warm_startup_checklist.1601565762.txt.gz ยท Last modified: 2020/10/01 08:22 by paul