^ ^Streamlined Warm Startup / Sep 11, 2020 / P Gabor, M Franz et al.^ ✔✘ ^ | ^ ^Streamlined Warm Startup / Oct 1, 2020 / P Gabor, M Franz et al.^ ✔✘ ^ |
| |Before you get started it is always a good idea to check the weather| | | | |Before you get started it is always a good idea to check the weather| | |
| |[[http://10.0.2.11/local/viewer/axisvid.html|all-sky camera etc]]| | | | |[[http://10.0.2.11/local/viewer/axisvid.html|all-sky camera etc]]| | |
|Control room|Start ''TCS_GLUE'' (double click desktop icon) | | | |Control room|Start ''TCS_GLUE'' (double click desktop icon) | | |
|Control room|''TCSglue'' main window: Make sure dome tracking is enabled (left-clicking on the dome-position field toggles between tracking enabled/disabled)| | | |Control room|''TCSglue'' main window: Make sure dome tracking is enabled (left-clicking on the dome-position field toggles between tracking enabled/disabled)| | |
|Control room|''TCSglue'' > ''Mount Control'' tab: Toggle the Telescope Control System's status bit regarding the dome slit: Click the ''Open Slit'' button (it will toggle to ''Close Slit''). The slit will then need to be opened from the dome in due course. **The dome slit control unit is deteriorating. As a consequence, opening the slit must be triggered in the dome. The Telescope Control System's status must anticipate the physical change.**| | | |Control room|''TCSglue'' > ''Mount Control'' tab: Toggle the Telescope Control System's status bit regarding the dome slit: Click the ''Open Slit'' button (it will toggle to ''Close Slit''). The slit will then need to be opened from the dome in due course. **The dome slit control unit is deteriorating. As a consequence, the dome slit motor must be activated in the dome.. The Telescope Control System's status must anticipate the physical change.**| | |
| | | | | | | | | |
|Dome|**Dome procedures**| | | |Dome|**Dome procedures**| | |