- | ^ ^Streamlined Warm Startup / Sep 11, 2020 / P Gabor, M Franz et al.^ ✔✘ ^ | + | ^ ^Streamlined Warm Startup / Oct 1, 2020 / P Gabor, M Franz et al.^ ✔✘ ^ |
| |Before you get started it is always a good idea to check the weather| | | | |Before you get started it is always a good idea to check the weather| | | ||
| |[[http:// | | |[[http:// | ||
Line 23: | Line 23: | ||
|Control room|@ VATTCONTROL (console) while logged in to // | |Control room|@ VATTCONTROL (console) while logged in to // | ||
|Control room|Start '' | |Control room|Start '' | ||
- | |Control room|TCSglue main window: Make sure dome tracking is enabled (left-clicking on the dome-position field toggles between tracking enabled/ | + | |Control room|'' |
+ | |Control room|'' | ||
| | | | | | | | | | ||
|Dome|**Dome procedures**| | | |Dome|**Dome procedures**| | | ||
Line 29: | Line 30: | ||
|Dome|Remove Dome Short | | | |Dome|Remove Dome Short | | | ||
|Dome|At quad box on curved wall below the dome short installation position, plug dome shutters into the power socket (**note on safety: this ensures dome short is out: tether attached to cord**).| | | |Dome|At quad box on curved wall below the dome short installation position, plug dome shutters into the power socket (**note on safety: this ensures dome short is out: tether attached to cord**).| | | ||
+ | |Dome|Plugging this cord in the socket powers up a gray electric box above the quad. Open the dome slit by turning and holding the selector (aka turn) switch in the '' | ||
|Dome|West door (leading to ladder to the roof) is to remain closed (for efficient airflow over the telescope)| | | |Dome|West door (leading to ladder to the roof) is to remain closed (for efficient airflow over the telescope)| | | ||
|Dome|**VATT 4k CCD Imager only:** start filling science camera dewar with LN2 (attach the grounding wire to the mirror cell first, then to the camera; insert needle into the dewar, fasten it with the bungee cord, open the valve); if using remotely controllable valve follow [[instructions in a separate document|VATT: | |Dome|**VATT 4k CCD Imager only:** start filling science camera dewar with LN2 (attach the grounding wire to the mirror cell first, then to the camera; insert needle into the dewar, fasten it with the bungee cord, open the valve); if using remotely controllable valve follow [[instructions in a separate document|VATT: | ||
Line 97: | Line 99: | ||
|Control room|**PEPSI only:** TCSglue main window: **during PEPSI runs, disable derotator tracking**| | | |Control room|**PEPSI only:** TCSglue main window: **during PEPSI runs, disable derotator tracking**| | | ||
|Control room|//If applicable,// | |Control room|//If applicable,// | ||
- | |Control room|Start INDI server (double click desktop icon): a terminal appears; you may minimize it. *The INDI server must be running in order to communicate with '' | + | |Control room|Start INDI server (double click desktop icon): a terminal appears; you may minimize it. **The INDI server must be running in order to communicate with '' |
|Control room|Start " | |Control room|Start " | ||
|Control room|Start autocollimation (more detailed instructions are in [[vatt: | |Control room|Start autocollimation (more detailed instructions are in [[vatt: |