^ ^Lightning Startup / Jul 9, 2021 / M Franz, P Gabor, D Brown ^ ✔✘ ^ | ^ ^Lightning Startup / Jul 9, 2021 / M Franz, P Gabor, D Brown ^ ✔✘ ^ | ||
- | | |In this scenario, the (simplified) lightning shutdown (see [[vatt: | + | | |In this scenario, the (simplified) lightning shutdown |
| | | | | | | | | | ||
| ^These actions take place on the VATT's building level 2 | | | | ^These actions take place on the VATT's building level 2 | | | ||
Line 11: | Line 11: | ||
| | | | | | | | | | ||
| ^These actions take place on VATT's building level 1 | | | | ^These actions take place on VATT's building level 1 | | | ||
- | |Loading dock |Plug the 4kVA UPS input 220V plug into the wall receptacle | | | ||
|Loading dock |Plug the 4kVA UPS output 220V plug into the receptacle in the rear of the UPS | | | |Loading dock |Plug the 4kVA UPS output 220V plug into the receptacle in the rear of the UPS | | | ||
+ | |Loading dock |Plug the 4kVA UPS input 220V plug into the wall receptacle | | | ||
|Telecom room |Close (turn on) the 100A breaker in '' | |Telecom room |Close (turn on) the 100A breaker in '' | ||
- | |Loading dock |Turn on the 4kVA UPS turning the key on the front panel. Check that it is '' | + | |Loading dock |Turn on the 4kVA UPS unit, turning the key on the front panel. Check that it is '' |
| | | | | | | | | | ||
| ^These actions take place back on the VATT's building level 2 | | | | ^These actions take place back on the VATT's building level 2 | | | ||
|Instrument room |Power up the two UPS units at the bottom of the right rack by holding down the power button on each until an audible signal (beep) is heard, then release the button | | | |Instrument room |Power up the two UPS units at the bottom of the right rack by holding down the power button on each until an audible signal (beep) is heard, then release the button | | | ||
|Instrument room |After the fans have finished spinning up, press the power button on the KVM auxiliary monitor (above the '' | |Instrument room |After the fans have finished spinning up, press the power button on the KVM auxiliary monitor (above the '' | ||
- | |::: |After '' | + | |::: |After '' |
- | |Instrument room |Power up '' | + | |Instrument room |Power up '' |
|::: |KVM: '' | |::: |KVM: '' | ||
|::: |More help on the KVM is available in [[vatt: | |::: |More help on the KVM is available in [[vatt: | ||
Line 36: | Line 36: | ||
| | | | | | | | | | ||
^ ^Proceed to the [[vatt: | ^ ^Proceed to the [[vatt: | ||
+ | | ^Do not forget to take the dome short out :!: | | |