| Ash Shutdown/Startup / June 15, 2021 / P Gabor | ✔✘ | |
|---|---|---|
| Control room |   | |
| Control room |   | |
| Control room |  Enclosure status (http://info.lbto.org)  | |
| Control room |   | |
| Shutdown | ||
| Control room | Turn off the large dome fan | |
| Control room | TCSglue: Stow the telescope | |
| Control room | TCSglue: Disable drives | |
| Control room | TCSglue: Close mirror cover | |
| Control room | TCSglue: Close dome slit | |
| Basement | Both fans need to be turned off. Therefore, everything needs to be turn off. See Azimuth Hydrostatic Oil Bearing | |
| Startup | ||
| Basement | Bring everything back. See Azimuth Hydrostatic Oil Bearing | |
| Control room | Turn on the large dome fan | |
| Control room | TCSglue: Open dome slit | |
| Control room | TCSglue: Open mirror cover | |
| Control room | TCSglue: Enable drives |