User Tools

Site Tools


vatt:sch:1999b
Update of Time allocated on VATT for Oct 1 - Dec 31, 1999 
____________________________________________________________________________

Nights of	to			instrument	for
_____________________________________________________________________________
_____________________________________________________________________________

10/1 - 10/4	Healy, Hester		vatt2k		YSOs in H II
 Fri - Mon						(S-26)

10/5 - 10/6	Healy, Sankrit		vatt2k		3C58 imaging
 Tue - Wed						(S-32)

NOTE: If the Kresge Engineering must continue beyond Oct. 1 to make
VATT scientifically ready, then these two allocations above will be later.

10/11 - 10/18	Healy,Hester,Sankrit	vatt2k		YSOs in H II (S-26)
  Mon - Mon						3C58 (S-32)

10/19 - 11/1	Cromwell, et al		VATT		Engineering
  Tue - Mon 

11/2 - 11/9	Boyle, Philip		vatt2k		Stromvil on Clusters
 Tue - Tue	Koopmann, Marin

11/10 - 11/14	Rettig,Tegler		vatt2k		Satellites &	
  Wed - Sun	Consolmagno, student?			Comet Nuclei

11/15 - 11/16	Cromwell et al		VATT		Engineering
  Mon - Tue

11/17 - 11/19	Garnavich,student?	vatt2k		High Z SNs
  Wed - Fri	assistant?

11/20 - 12/1	Cromwell et al		VATT		Engineering
  Sat - Wed

12/2 - 12/8	Taylor,Windhorst	vatt2k		U-Band Galaxies
 Thu - Wed	Burg,Hibbard				(S-31)

12/9 - 12/11	Garnavich,student?	vatt2k		High Z SNs
 Thu - Sat

12/12 - 12/14	Healy,Hester		vatt2k		YSOs in H II
  Sun - Tue						(S-26)

12/15 - 12/31	Cromwell et al		VATT		Engineering
  Wed - Fri
____________________________________________________________________________

Note:  Intensified engineering effort is underway because of a grant from
the Kresge Foundation to help realize the new technology of this telescope.
Observers may be asked to allow some daytime engineering that should not
interfere with their program.
vatt/sch/1999b.txt · Last modified: 2021/03/31 23:49 by paul