User Tools

Site Tools


vatt:liquid_nitrogen_for_itl_cameras

This is an old revision of the document!


  • make sure the ground wire is connected:
    • first to the mirror cell and
    • then to the camera
  • insert the nozzle into the dewar, and attach it using the bungee cord
  • start filling science camera dewar with LN2; if using remotely controllable valve follow instructions in a separate document
  • fill out LN2/camera log – listen for full dewar, cease flow when dewar is full
  • disconnect LN2 filler hose from camera dewar, move storage dewar off of telescope platform and south, to dome silo wall)
  • remove camera ground wire and clip it on silo, near storage dewar
vatt/liquid_nitrogen_for_itl_cameras.1718141782.txt.gz · Last modified: 2024/06/11 14:36 by paul