This is an old revision of the document!
*Start filling science camera dewar with LN2; if using remotely controllable valve follow instructions in a separate document *fill out LN2/camera log – listen for full dewar, cease flow when dewar is full *disconnect LN2 filler hose from camera dewar, move storage dewar off of telescope platform and south, to dome silo wall) *remove camera ground wire and clip it on silo, near storage dewar