This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
public:observer:kuiper_61_telescope_checklist_for_basic_certification [2019/12/05 10:20] mel |
public:observer:kuiper_61_telescope_checklist_for_basic_certification [2020/02/27 12:29] (current) mel |
||
---|---|---|---|
Line 32: | Line 32: | ||
* How to use the software on Gerard properly (dataserver, | * How to use the software on Gerard properly (dataserver, | ||
* Leave Azcam running at the end of the night/run unless going into lightning shutdown. | * Leave Azcam running at the end of the night/run unless going into lightning shutdown. | ||
- | * LN2 how to fill | ||
- | * LN2/gaseous N2 pressurize | ||
- | * LN2 tank swap procedure – at a minimum review | ||
- | * **Stress proper PPE use! Recommend wearing long pants and closed toed shoes whenever observing** | ||
* Have trainee actually get everything up and running, find focus etc. | * Have trainee actually get everything up and running, find focus etc. | ||
- | * For the M4K, the dewar MUST be filled every 24hrs. | + | |
- | * Warning!!! LN2 can spill out of camera dewar after filling! | + | * LN2 how to fill, use static discharge strap whenever touching the dewar, touch metal fill tube to the outside of the fill port before inserting, etc |
+ | * LN2/gaseous N2 pressurize | ||
+ | * LN2 tank swap procedure – at a minimum review | ||
+ | * **[[.: | ||
+ | | ||
+ | * If a camera has gone longer than 24 hours, call a staff member. | ||
+ | * The staff member will probably ask you first if the scope is in lightning shutdown, if not they' | ||
+ | * If the telescope is in lightning shutdown, they will ask you to check if the fill port is outgassing. | ||
+ | | ||
====Telescope Operations General Items:==== | ====Telescope Operations General Items:==== |