This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
public:observer:kuiper_61_telescope_checklist_for_basic_certification [2019/06/19 09:11] mel |
public:observer:kuiper_61_telescope_checklist_for_basic_certification [2020/02/27 12:29] (current) mel |
||
---|---|---|---|
Line 32: | Line 32: | ||
* How to use the software on Gerard properly (dataserver, | * How to use the software on Gerard properly (dataserver, | ||
* Leave Azcam running at the end of the night/run unless going into lightning shutdown. | * Leave Azcam running at the end of the night/run unless going into lightning shutdown. | ||
- | * LN2 how to fill | ||
- | * LN2/gaseous N2 pressurize | ||
- | * LN2 tank swap procedure – at a minimum review | ||
* Have trainee actually get everything up and running, find focus etc. | * Have trainee actually get everything up and running, find focus etc. | ||
- | * For the M4K, the dewar MUST be filled every 24hrs. | + | |
- | * Warning!!! LN2 can spill out of camera dewar after filling! | + | * LN2 how to fill, use static discharge strap whenever touching the dewar, touch metal fill tube to the outside of the fill port before inserting, etc |
+ | * LN2/gaseous N2 pressurize | ||
+ | * LN2 tank swap procedure – at a minimum review | ||
+ | * **[[.: | ||
+ | | ||
+ | * If a camera has gone longer than 24 hours, call a staff member. | ||
+ | * The staff member will probably ask you first if the scope is in lightning shutdown, if not they' | ||
+ | * If the telescope is in lightning shutdown, they will ask you to check if the fill port is outgassing. | ||
+ | | ||
====Telescope Operations General Items:==== | ====Telescope Operations General Items:==== | ||
Line 109: | Line 114: | ||
====Certification Process: | ====Certification Process: | ||
* Contact a certifier and work around THEIR schedule. | * Contact a certifier and work around THEIR schedule. | ||
+ | * [[: | ||
====Record Keeping: | ====Record Keeping: | ||
* Everyone running the telescope needs the proper documentation, | * Everyone running the telescope needs the proper documentation, | ||
- | * Certification sheets can be found in the 61” control room or in the Mountain Operations office N350. They must be filled out and signed by both certifier and newly certified. | + | * Certification sheets can be found in the 61” control room, or our wiki page: https:// |
* You need to turn in a digital picture of yourself along with your completed certification form to be considered certified. | * You need to turn in a digital picture of yourself along with your completed certification form to be considered certified. | ||
* Certification sheets must then be turned into Melanie Waidanz or Joe Hoscheidt where we can file the hard copy and update our database. | * Certification sheets must then be turned into Melanie Waidanz or Joe Hoscheidt where we can file the hard copy and update our database. |