User Tools

Site Tools


public:catalinas:lemmon:minnesota_60:minnesota_60_telescope

This is an old revision of the document!


2MASS:

For manual dithering -

    S
    "
 W=="==E
    "
    "
    N

Cold Start Power Up Sequence
Procedure for coming out of lightning shutdown or checking out the telescope and instrument.


2mass_ln2_fill_instructions_with_pictures
2MASS liquid Nitrogren fill instructions.


2mass_umn60_troubleshooting
Common issues and how to solve them at the Minnesota 60“ and 2MASS instrument.


public/catalinas/lemmon/minnesota_60/minnesota_60_telescope.1559931300.txt.gz · Last modified: 2019/06/07 11:15 by davner