public:observer:kuiper_61_telescope_checklist_for_basic_certification
61” Trainer's Checklist for Basic Certification
Preparing for your observing run:
Site Overview:
Building layout
Importance of keys, cell phone and flashlight
Arrival, departure, parking, and headlights off after dark
Dormitory:
Food policy - Don’t leave food behind
Write your name on the chalk board
Where the laundry room is
Heat turned down to 55 in the winter when you leave
Quiet hours are until 4 pm
Keep blinds drawn at night
How to leave the dorms after your run (strip bed, close windows, draw shades, turn off light, etc)
TCS-NG:
Go through TCS-NG manual (in binder) having the trainee do the steps listed.
How to initialize
MOON Wiki
NG binder in control room
Xephem binder in control room
How to login/passwords to computers/wifi
Mont4K:
How to use the M4K - go over manual online at the 61” website
How to use Azcam
How to use the software on Gerard properly (dataserver, galilserver fw-gui, IRAF, ds9)
Leave Azcam running at the end of the night/run unless going into lightning shutdown. This helps camera remain stable. If program is closed, it may mess up data quality for next observer.
Have trainee actually get everything up and running, find focus etc.
Dewar filling
LN2 how to fill, use static discharge strap whenever touching the dewar, touch metal fill tube to the outside of the fill port before inserting, etc
LN2/gaseous N2 pressurize
LN2 tank swap procedure – at a minimum review
Stress proper PPE use! Wear long pants and closed toed shoes whenever observing. You must wear cryo gloves, goggles AND a face shield when handling liquid nitrogen. Long sleeves must also be worn; we have provided lab coats if you don't have long sleeves
For the M4K, the dewar MUST be filled every 24hrs. NO EXCEPTIONS.
If a camera has gone longer than 24 hours, call a staff member. Sometimes the M4K is warming up deliberately, so always call if you find it over 24 hours between fills.
The staff member will probably ask you first if the scope is in lightning shutdown, if not they'll want you to check the cam temp on Azcam. NEVER FILL THE DEWAR ABOVE -40C
If the telescope is in lightning shutdown, they will ask you to check if the fill port is outgassing. Sometimes it is not readily apparent, so you will need to put your thumb over the fill port for 10 seconds and remove it to see if a spurt of gas comes out. They will also ask if the outside of the dewar is sweating. It will look like condensation on the outside of iced water. From this point on, the staff member will guide you as to what to do next.
Warning!!! LN2 can spill out of camera dewar after filling!
Telescope Operations General Items:
Rules for safe operation of telescope
Mirror covers are the last thing to open at start of night/first to close at the end
How to operate exhaust fan downstairs if/when it’s necessary. Review when to use the exhaust fan (humidity inside vs. outside)
Know where the elevator floor is in relation to the instrument and yoke
Make sure ladders are out of the way
Use infrared camera and watch every time you move the telescope.
If operator for a group of people, no one but certified observer can move telescope
When you leave for the night, make sure you disable the telescope in TCS.
Laptop is located in the console upstairs in the dome
Actually use the laptop to move the telescope around
Where to write fill times and humidity readings
Limits (hardware limits, software limits, weather limits)
Check the weather regularly! (Joe checks at a minimum once an hour on good nights)
Lightning shutdown
Stowing dome/windscreens
Video finder scope, hand paddle, finder scopes
Losing pointing and how to recover, actually lose pointing and have them find it again
Setting/adjusting the iris
Don’t turn on dome lights with shutter open
How to get data off Gerard
How to leave telescope at the end of night when not going into lightning shutdown.
Weather:
BigAux PC:
Control Room:
How to login/passwords to computers/wifi
Kitchen – how to open refrigerator, work stove etc.
Heater
Door close policy when rooms heated (control room and bathroom)
Regular call list for problems (Dave, Jim, Steve, Joe, Gary, Melanie)
Emergency call list, other numbers list (Trico, Sheriff Department)
Security:
Gate needs to be shut at night
Don’t let hikers on to the grounds/in the buildings
Set the alarm at the 61” and lock the door when you’re not there
Door to catwalk needs to be bolted shut
Power Failures:
Generator should start automatically. If it doesn't call Mtn Ops for assistance.
Phase indicator lights in dome and on powerhouse
Emergency flashlight locations
Notifying Trico and Mtn Ops
Observer Requirements:
Need to be certified on telescope, instrument, and NG
Observer Request Forms – turned in 2 weeks prior
Universal Rules:
If you give up your run or leave during your run, filling the dewar is still your responsibility. Unless you can arrange with Mountain Operations prior to calling off your run, you must still come up to the mountain and fill the dewar every 24 hours.
If it is the last day of your run, you must make sure the dewar has enough hold time since the last fill until the next observer arrives (a safe bet is sunset). Filling the dewar is still your responsibility until the next observer arrives. The only time it’s Mountain Operations responsibility is during TBS time, or if you arranged with us to have us fill the dewar ahead of time.
Check the weather! If there is any chance of thunderstorms during the morning or afternoon of the day you leave, you need to put the telescope in lightning shutdown before you go. If there is a chance of thunderstorms, the scope must be put in lightning shutdown.
You need to keep on top of the weather. No moisture, condensation, dust, ash, pine needles etc. should ever get on the mirror. Staying open when it’s unsafe is grounds for decertification.
Alcohol and drug abuse while operating the telescope is not tolerated.
Certification Process:
Record Keeping:
Everyone running the telescope needs the proper documentation, otherwise nights may be lost
-
You need to turn in a digital picture of yourself along with your completed certification form to be considered certified.
Certification sheets must then be turned into Melanie Waidanz or Joe Hoscheidt where we can file the hard copy and update our database.
If we cannot find your documentation, and don’t provide us with proof of your certification, your night may be lost.
Certification Eligibility:
If you are certified but have not observed in a year, you now must take a refresher course with a certifier. This goes over the changes that have occurred since the last time you observed, and is especially relevant at the 61”. Failure to work around a certifiers schedule to get refreshed could lead to a loss of your nights. This can be done with any of the certifiers.
Once again being able to observe is a privilege not a right. The rules are in place to keep not only the telescope and instrument safe but the observers as well. We have the right to decertify anyone if they break the rules.
Required and Suggested Reading Prior to Certification:
public/observer/kuiper_61_telescope_checklist_for_basic_certification.txt · Last modified: 2020/02/27 12:29 by mel