Lightning Shutdown, Short Version: Updated 2/15/19
Changes coming out of Downtime 2018
We have an “always on” UPS now, which feeds a power strip above BokAux. The Aux computer, the WIFI, BokPOP, and the phones are all plugged into this power strip which means these are now always left on. You can use BokAux now to keep an eye on the weather by pulling up the weather sites bookmarked on the computer in Firefox.
BokCCD2 is now the main Azcam computer for both the B&C and 90Prime instruments. We are going to have a spare Azcam Login machine (BokCCD4) in the future. The username and password to get in are the same as before.
There is no longer an UPS under the counter feeding console power. There is a new UPS in the black computer rack labeled “Console UPS” To shut this down you press the on/off button and select “Off Immediately” with the OK button. This takes a while to shut off. When you turn it back on using the power button, you must use the arrow keys and OK button to choose “On Immediately” or it will not turn on.
The weather computer is now password protected, and the password is posted on the monitor. You turn on the weather computer by pressing the top edge of the left hand corner (it's beveled at a 45 degree angle), of the PC mounted on the wall next to the monitor.
CASS (B&C, WIFIS, SCC) Lightning Shutdown
Complete a “Normal Shutdown” if you have not done so already.
Control Room
Turn off upper dome power
Turn off dome motor power
At the Operators Console:
Shutdown TCS computer
Shutdown guider computer
Turn IIS switch to OFF
Turn Dome switch to MANUAL
Turn off console
Push in emergency stop button on console
Unplug dome mic if in use next to AED
Observers Workstation
Shutdown AzCam program, shutdown Azcam computers (BOKCCD2 & BOKCCD4 if in use) from start menu, and shutdown AzCam Xterm
Shutdown programs on Bart, shutdown Bart from Start Menu, and Bart Xterm
Shutdown weather computer
Electronics Computer Rack Area
Using the KVM switch make sure all computers in the rack are off (except BOKPOP):
#2 Bokccd2 Azcam Login (Should already be off)
#5 Priscilla (if in use)
#6 Bart (should already be off)
#7 BokPOP (Please leave BOKPOP turned ON)
Turn off flat field lamp controller if in use
Turn off printer
Turn off (3) UPS units in bottom of the rack
Note: The CONSOLE UPS powers the Operators Console, make sure everything in it is turned off first. You will need to hit the power button, then use the arrow and OK buttons to choose “Off Immediately” or it will not shut down.
Warm Room Cable Closet
Unplug three plugs with red tape on your right as you enter the door down low
Unplug 1 twist lock plug with red tape west wall
Unplug Brandywine NTP Server's Ethernet cable, BNC cable and power cable on west wall
Second Floor Pier Room
Shutoff UPS in rack and unplug
Second Floor Office
Unplug power strip from wall
Disconnect phone line from fax machine
There is a computer tower that sits to the left of the desk. If on, turn off by pushing the power button.
90Prime Lightning Shutdown
Complete a “Normal Shutdown” if you have not done so already
Instrument
Unload filter from filter wheel
Turn off “90 Prime CCD” and “90 Prime System” rotary switches on black computer rack
Control Room
Turn off upper dome power
Turn off dome motor power
At the Operators Console:
Shutdown TCS computer
Shutdown guider computer
Turn IIS switch to OFF
Turn Dome switch to MANUAL
Turn off console
Push in emergency stop button on console
Unplug dome mic if in use next to AED
Observers Workstation
Shutdown AzCam program, shutdown Azcam computer (BOKCCD2) from start menu, and shutdown AzCam Xterm
Shutdown programs on Bart, shutdown Bart from Start Menu, and Bart Xterm
Shutdown weather computer
Electronics Computer Rack Area
Using the KVM switch make sure all computers in the rack are off except BokPOP
#2 Bokccd2 Azcam Login
#4 Bokccd4 Spare Azcam Login
#5 Priscilla (if in use)
#6 Bart (should already be off)
#7 BokPOP (should stay ON)
Turn off flat field lamp controller if in use
Turn off printer
Turn off (3) UPS units in bottom of the rack
* Note: The CONSOLE UPS powers the Operators Console, make sure everything in it is turned off first. You will need to hit the power button, then use the arrow and OK buttons to choose “Off Immediately” or it will not shut down.
Warm Room Cable Closet
Unplug three plugs with red tape on your right as you enter the door down low
Unplug 1 twist lock plug with red tape west wall
Plug in Brandywine NTP Server's Ethernet cable, BNC cable, and power cable on west wall
Second Floor Pier Room
Shutoff UPS in rack and unplug
Second Floor Office
Unplug power strip from wall
Disconnect phone line from fax machine
There is a computer tower that sits to the left of the desk. If on, turn off by pushing the power button.
Cold Start up- Coming out of Lightning Shutdown
Second Floor Office
Plug in power strip
Connect phone line to fax machine
Turn on the computer tower to the left of the desk by pressing the power button.
Second Floor Pier Room
Plug in UPS and turn on
Warm Room Cable Closet
Plug in three plugs with red tape on your right as you enter the door down low
Plug in 1 twist lock plug with red tape west wall
Plug in Brandywine NTP Server's Ethernet cable, BNC cable and power cable on west wall
Turn on Bokpop (it should already be ON)
Turn on Bart
Turn on BokAux (should already be on)
Turn on printer
90Prime users
B&C users