Last updated: 2019/06/21 15:21
Cold Start Power Up Sequence
Procedure for coming out of lightning shutdown or checking out the telescope and instrument.
Dome Part 1
Dome encoder cable over entry door
West side of blue yoke, declination axis
Dec encoder
Dec motor
Dec tac
West side of base flange
Finder scope lamp power (for reticle)
East side of base flange
Limit cable
Index sensor cable
Inside the south pier
From outlet box #5
Power cord running to power strip inside blue rack
Power cord running to power strip mounted to south pier
Power cord running to index meter box
Black rectangle cable connection laying inside
NOTE: Two cables plugged into one another that have black connectors
Index meter cable
NOTE: Connects up underneath backside of index meter box
RA Axis
RA encoder on west side
RA motor cable on east side
RA tachometer cable on east side
Backside of blue rack
Silver outlet box
Mux power plug
Bus extender cable
Bus BNC
Bus extender
Bus cable
NOTE: There is a black screw keeping cable in place.
Backside of dome box
#4 paddle
#2 bus extender cable
Dome encoder
DEC encoder cable
RA encoder cable
Backside of stepper box
Gate out BNC
Control Room
Backside of blue control rack
Bottom of rack
#5 TTL mono dome
#3 stepper motor control
#2 computer manual to dome and telescope control
#1 single paddle control to old paddle
FORTH computer backside
NOTE: If 2MASS is on the telescope there should be nothing to connect.
Silver outlet box
Bus BNC
Power supply cable
Power supply cable
Backside of rack #1
PC splitter box
“From dome” silver cable
Video monitor
Video input BNC cable
TV offset guide control backside
Round connector
Focus panel backside
Focus cable on left hand side
NOTE: Easy to miss
Chop box
Large round connector cable
Transducer BNC
Backside of rack #2
RA motor round connector
Temperature sensor square gray plug
NOTE: Easy to miss
Backside of rack #3
DEC motor cable
Master Control Panel backside
Slew SW BNC far left
J12 under cccc to the right
Telescope drive control backside
Limit cable p8
#5 TDC cable
Tilt meter cable
NOTE: Easy to miss, just under DEC preamp
#5 DEC preamp
#7 RA preamp
Front of blue control panel
Ribbon cable from port 5 to 5
Front of rack #1
Microphone connection for dome
Behind control console
Plug two cables running into ceiling
Plug power strip and UPS laying on the floor into the wall outlet
Plug two ethernets
Dome Part 2
2MASS
Plug in UPS into wall outlet.
Turn on UPS.
Plug in orange extension cord into UPS
Remove the cover form temperature control port.
While wearing a grounding strap, connect temperature controller cable.
Plug in temperature controller unit into UPS.
NOTE: Sits on blue rack
Plug in the Controller square gray power supply into power strip at base of telescope.
Plug in the IR Camera Power silver box into power strip at base of telescope.
Turn on Controller power supply
Turn on IR Camera power supply
Follow the instructions in the UMINN 60"/2MASS binder to finish setup.