User Tools

Site Tools


public:catalinas:lemmon:minnesota_60:2mass

This is an old revision of the document!


2MASS:

For manual dithering -

    S
    "
 W=="==E
    "
    "
    N

Cold Start Power Up Sequence
Procedure for coming out of lightning shutdown or checking out the telescope and instrument.


2MASS LN2 Fill Instructions With Pictures
2MASS liquid Nitrogren fill instructions.


2MASS IR Camera Checkout Form

public/catalinas/lemmon/minnesota_60/2mass.1580850368.txt.gz · Last modified: 2020/02/04 14:06 by mel