Pre-Observing Procedures

This procedure is only for when the telescope has been used regularly and was not left in lightning shutdown. If things are obviously a miss (I.E. the power to everything is off) it would be good to perform the Startup Procedure.

Before actually performing any steps to get the telescope ready for observing you must check a few things and note any anomalies in the trouble report. These include:

Outside

Inside

If the answer to any of these questions is *YES* then there may be a problem and it should be noted in the trouble report.