=====Vatican Advanced Technology Telescope===== {{ wiki:800px-vatt_groundlevel.jpg?100}} The VATT telescope has an Alt/Az mount and uses a 1.8-m f/1.0 honeycombed construction, borosilicate primary mirror developed by the University of Arizona Mirror Lab. Its secondary mirror is a 0.38-m f/0.9 Zerodur manufacted by the Space Optics Research Laboratory ((http://vaticanobservatory.org/VATT/)). Both observing time and responsibility for VATT are shared with the University of Arizona on a 75% The Vatican Observatory Research Group VORG, 25% basis. Limited resources prevent VATT from being a visitor observatory, but collaborations are welcomed by VORG, especially when suitable instrumentation is provided for shared use at VATT.((http://vaticanobservatory.org/VATT/)) Altitude : 3191 meters = 10,469 ft Latitude : 32° 42' 04.69" N Longitude : 109° 53' 31.25" W Optical System : aplanatic Gregorian, f/9 Focal Length : 16.48 m Primary Mirror : f/1.0, Diameter 1.83 meters = 72 inches Secondary Mirror : f/0.9, Diameter 0.38 meters = 14.96 inches Back Focal Distance : 50.80 mm (effective) Vignetting-Free Field : 72 mm diameter (15 arcmin) Image Scale : 12.52 arcsec/mm Image quality : 0.1 arcsec throughout 6.8 arcmin diameter flat FOV Mount : altitude-azimuth with derotator [[VATT:for-applicants|Read-Me before applying for VATT time]]\\ [[VATT:observers-list|List of Approved Observers]]\\ [[vatt:sch:2024a|Current Schedule]]\\ [[VATT:past-schedules|Past Schedules]]\\ [[VATT:astrolinks|Useful Astronomy Links]]\\ [[vatt:vatt_weather|Weather & Environmental Conditions & Hazards]]\\ [[vatt:surveilcams|Dome, Security & Finderscope Cameras]]\\ [[vatt:mgio-radio-codes|MGIO Radio Call Codes]] =====Safety===== * [[VATT:Wind-gust limit]] =====What's New at VATT===== *[[VATT:What is New at VATT]] *[[VATT:Miscellaneous Tips]] =====The Telescope & Instruments===== * [[VATT:Brief Chronology of VATT Development]] * {{ :vatt:blanco_et_al_spie_1236_1990.pdf |Blanco et al. SPIE 1990}} * {{ :vatt:west_et_al_spie_2871_1997_pdf.pdf |West et al. SPIE 1997}} * [[VATT:A paper on Mt Graham atmosphere]] * [[VATT:Optical Diagram]] * [[VATT:Specifications]] * [[VATT:Instrumentation and Computers]] * [[VATT:Filters]] =====Base Camp & Swift Trail===== *[[VATT:Base Camp and Swift Trail]] prior to your arrival =====Start up and shutdown:===== *[[VATT:VATT Warm Startup Checklist]] *[[VATT:VATT Warm Shutdown Checklist]] *[[vatt:vatt_ash|VATT Ash Shutdown/Startup Checklist]] *[[VATT:VATT Lightning Shutdown Checklist]] *[[VATT:VATT Lightning Startup Checklist]] === Individual tasks === *[[vatt:vatt_reboot_vatttel|(Re)Booting VATTtel]] *[[vatt:vatt_neslab|Starting NESLAB]] *[[vatt:vatt_stall|Recovering from a stall]] *[[vatt:vatt_powerglitch|Recovering from a power glitch]] =====Telescope Operation===== *[[VATT:Jinvoo LN2 valve|Remotely operated valve on LN2 dewar]] *[[VATT:Hexapod| Collimate and Focus (New Hexapod)]] *{{ :vatt:instruction_4kcam.pdf |Instructions for use of the VATT 4K Camera}} *{{ :vatt:imaging_log_sheet.pdf |CCD Imager Log Sheet}} *VATTspec {{ :vatt:vattspec-instructions.pdf |General Instructions}} *VATTspec {{ :vatt:vattspec-guider-notes.pdf |Instructions on Guiding}} *[[VATT:Dome Flats]] (Gabor style) *[[VATT:LED Dome Flats]] (Boyle style) *[[PHD2:PHD2 Guiding (Abbreviated)]] *[[VATT:Cosmograil]]/H0LiCOW *Guider: [[Guider: Temporary fix]] =====Peripheral Systems===== *[[VATT:Mirror Cell Thermal Reader]] *[[VATT:Secondary Mirror]] *[[VATT:logging|Logging System]] *[[VATT:surveilcams|Dome, security & finderscope cameras]] =====Data Retrieval===== *[[VATT:How do I retrieve my data from VATT servers]] =====Maintenance and Engineering===== * [[VATT:Fiber Panel Test]] * [[PHD2:PHD2 Guiding]] * [[VATT:Oil chillers]] =====Superannuated Contents===== * [[VATT:Collimate VATT| Collimate VATT (Old)]] * [[VATT:VATT Warm Startup Checklist (2011)]] * [[VATT:VATT Warm Shutdown Checklist (2011)]] * [[VATT:|Calibrate ]] * {{ :vatt:vatt_instructions.pdf |VATT Instructions (2005)}} *[[VATT:VATT Streamlined Warm Startup Checklist]] *[[VATT:Remote Observation| Remote Observation Checklist]] *{{ :vatt:vatt_warm_startup_checklist_of_05292018c.pdf |Warm Startup Checklist for VATT operation during PEPSI runs}}