This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
vatt:sch:2024b [2024/10/01 02:19] paul |
vatt:sch:2024b [2025/01/15 14:05] (current) paul |
||
---|---|---|---|
Line 1: | Line 1: | ||
< | < | ||
- | Memo: Oct. 1, 2024 DRAFT VATT schedule ver. sch24b9.txt | + | Memo: Jan. 15, 2025 DRAFT VATT schedule ver. sch24b11.txt |
From: | From: | ||
VATT Telescope Allocation Committee (VATTAC) P. Gabor (Chair) | VATT Telescope Allocation Committee (VATTAC) P. Gabor (Chair) | ||
Line 72: | Line 72: | ||
Mon - Wed Oldroyd & Farrell | Mon - Wed Oldroyd & Farrell | ||
- | Two options to be confirmed: | + | 11/28 - 1/19 Engineering |
- | A< | + | Thu |
- | 11/28 - 12/2 Kikwaya | + | |
- | Thu | + | |
- | 12/3 | + | 1/20 |
- | Tue - Wed | + | Mon - Fri |
- | > | + | |
- | B< | + | |
- | 11/28 - 12/4 Strassmeier | + | |
- | Thu - Wed | + | |
- | 12/5 | + | 1/25 |
- | Thu - Wed 1stQt 12/8 | + | Sat - Fri |
- | > | + | |
- | 12/12 - 12/15 TBS | + | |
- | Thu - Sun | + | |
- | 12/16 - 12/18 | ||
- | Mon - Wed | ||
- | |||
- | 12/19 - 1/2 | ||
- | Thu - Thu | ||
- | |||
- | 1/3 - 1/31 TBS | ||
- | Fri - Fri FULL 1/13 | ||
##################################################################### | ##################################################################### |