This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
vatt:liquid_nitrogen_for_itl_cameras [2024/06/11 14:36] paul |
vatt:liquid_nitrogen_for_itl_cameras [2024/06/11 14:38] (current) paul |
||
---|---|---|---|
Line 3: | Line 3: | ||
* then to the camera | * then to the camera | ||
*insert the nozzle into the dewar, and attach it using the bungee cord | *insert the nozzle into the dewar, and attach it using the bungee cord | ||
- | *start filling | + | *opening the valve, |
- | *fill out LN2/camera log – listen for full dewar, cease flow when dewar is full | + | *fill out LN2/camera log – listen for full dewar |
+ | *cease flow when dewar is full | ||
*disconnect LN2 filler hose from camera dewar, move storage dewar off of telescope platform and south, to dome silo wall) | *disconnect LN2 filler hose from camera dewar, move storage dewar off of telescope platform and south, to dome silo wall) | ||
*remove camera ground wire and clip it on silo, near storage dewar | *remove camera ground wire and clip it on silo, near storage dewar | ||