This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
public:lemmon:minnesota_60:2mass_ln2_fill_instructions_with_pictures [2018/04/19 15:28] mel |
— (current) | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | Instructions for Filling 2MASS with LN2 | ||
- | - Lift LN2 dewar on top of blue adjustable cart and wheel it close to the instrument. | ||
- | - Hook up yellow rubber hose to LN2 tank. It should already be hooked to the instrument, but if not hook up to the LN2 fill port.{{ : | ||
- | - Take off small silver clamp that is on the yellow hose.{{ : | ||
- | - Hook up the N2 clear hose to the venting port on the LN2 dewar. {{ : | ||
- | - Open the LN2 dewar to start filling 2MASS. | ||
- | - Open the small venting valve on the dewar, on this dewar its the small gold valve right next to where the clear hose attaches. | ||
- | - Turn on the N2 by the pier by turning the grey handle to open the cannister. |