User Tools

Site Tools


public:catalinas:bigelow:kuiper_61:lightning_shutdown

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:catalinas:bigelow:kuiper_61:lightning_shutdown [2024/09/19 19:40]
egreen
public:catalinas:bigelow:kuiper_61:lightning_shutdown [2024/09/20 18:11] (current)
egreen
Line 1: Line 1:
 =====Lightning Shutdown===== =====Lightning Shutdown=====
  
-  - Complete "End of Normal Night of Observing" shutdown+  - Complete "End of Normal Night of Observing" procedures
   - In Dome   - In Dome
-    * Turn off all instrument electronics (for M4K this would be camera power supply, guider controller, Galil motor (for filter wheel and guider pickoff mirror), guider chiller, and shutter control box). +    * Turn off all instrument electronics (for M4K this would be the camera power supply, guider controller, Galil motor (for filter wheel and guider pickoff mirror), guider chiller, and shutter control box). 
     * Unplug the four (4) cords from the “clean” orange outlets on the underside of the telescope. The cords from the eastside outlets go to the camera power supply and guider controller, the cords from the westside outlets go to the two (2) power strips. NOTE: if M4K is not installed, configuration of power cords plugged into telescope may be different.      * Unplug the four (4) cords from the “clean” orange outlets on the underside of the telescope. The cords from the eastside outlets go to the camera power supply and guider controller, the cords from the westside outlets go to the two (2) power strips. NOTE: if M4K is not installed, configuration of power cords plugged into telescope may be different. 
     * Shut down laptop computer (if in use) and unplug two (2) cords from the “clean” orange UPS outlets located near the floor on the platform control console.     * Shut down laptop computer (if in use) and unplug two (2) cords from the “clean” orange UPS outlets located near the floor on the platform control console.
Line 13: Line 13:
     * Shut down BigPop computer and Telcom Server via button or switch on front of their panels.     * Shut down BigPop computer and Telcom Server via button or switch on front of their panels.
     * Turn off printer.     * Turn off printer.
-    * Unplug all power cords marked with red tape from “clean” (orangeoutlets on wall behind the computer monitors.+    * Unplug all power cords marked with red tape from orange outlets on wall behind the computer monitors.
     * Turn off CSS surge strip at back of table by the door and unplug surge strip cord from orange outlet below (if not already done).     * Turn off CSS surge strip at back of table by the door and unplug surge strip cord from orange outlet below (if not already done).
   - In UPS room   - In UPS room
public/catalinas/bigelow/kuiper_61/lightning_shutdown.1726800027.txt.gz · Last modified: 2024/09/19 19:40 by egreen