This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
kuiper:m4k_operators_notes [2019/02/05 13:49] davner |
kuiper:m4k_operators_notes [2019/02/08 13:03] davner |
||
---|---|---|---|
Line 45: | Line 45: | ||
* Plug in and turn on the following in the warm room: | * Plug in and turn on the following in the warm room: | ||
* The power strip on the west wall (includes new Dome TV Camera) | * The power strip on the west wall (includes new Dome TV Camera) | ||
+ | * The computer racks that were plugged into orange outlet #4 on wall have been plugged into a power strip behind the monitors. Make sure the power strip gets plugged in. | ||
+ | * The CSS monitors (the four monitors mounted on the wall) need power. There is a black power strip labeled that needs to be plugged into the wall. | ||
* BIGAUX | * BIGAUX | ||
* All the monitors in the control room (BIGAUX, BIGCCD, Gerard, bigguider, and telescope camera monitor) | * All the monitors in the control room (BIGAUX, BIGCCD, Gerard, bigguider, and telescope camera monitor) | ||
Line 355: | Line 357: | ||
**RA:** | **RA:** | ||
{{ : | {{ : | ||
- | |||